The six-week project that took six months

When you quote a fixed fee for a six-week project, you count on being able to finish it and move on. The client has work to do before that can happen, and you control very little of their time. An approval that needs ten minutes of someone’s attention can take weeks to arrive.

After several waits like that, the job can still be on your project list six months later. You’ve had to fit it around newer work and spend time getting people back into it. The fee may be covering hours you never allowed for, even though the client hasn’t asked for anything extra.

Consider a small website scheduled around design approval, a build using the client’s final copy, and a review before launch. If design approval comes three weeks late and the designer then needs another two weeks to finish a different job, the first delay has already added five weeks. A later wait for the copy can disrupt the build in the same way. Every missed booking leaves the job competing for space with work you took on expecting this one to be finished.

What it takes to pick the job up again

If the same person returns to familiar work and can carry on where they left off, the delay may have added very little labour.

But a website left untouched for a month can need some attention before anyone makes the next change. The designer has to remember which version was approved and why a particular request was turned down. A colleague taking over will need that explained. The person handling the client may spend an hour preparing for a call that would have taken ten minutes while the work was still fresh.

This is time spent on the job, with little new work to show the client. It is easy to leave out of a quote that assumes one stage will follow fairly soon after another. It is also easy to record it as general admin, especially when the owner does the chasing between other jobs.

To put a cost on the example, suppose the website has a fixed fee of $18,000 and a labour budget of $12,000, with no outside purchases. Allow eighteen hours in total for reviewing old work and briefing people across three restarts, plus six hours for calls and follow-up emails. At an average labour cost of $80 an hour, those 24 hours use $1,920 of the fee.

Fee                              $18,000
Planned labour cost             -$12,000
Extra time (24 h × $80)          -$1,920
                                ────────
Left for overhead and profit      $4,080
Originally expected               $6,000

The extra time has used almost a third of what the job was meant to leave for overhead and profit. None of it required an extra page or a change to the brief. The cost grew because the team had to return to the same work several times.

If you kept someone free for the client and couldn’t find other work for them, that idle time has a cost too. Record it separately from the hours they spent working on the site.

Before the job loses its place

You have a chance to avoid some of this while the original dates still hold. If the build is booked for next week, the client needs to know when the final copy must arrive to keep that booking.

“We’ve set aside next week to build the pages, so we’ll need the approved copy by Thursday. If it comes later, I’ll have to find another week for the build. I can confirm that once we have the copy, but it will mean moving the launch date.”

Your contact may be waiting on somebody else and unable to promise Thursday. Knowing that now lets you give the week to another job. It also gives them something specific to explain internally: the copy is holding up a booked week of work, and the next available week may be some way off.

If the job has to pause, a short note left with the files can save some of the cost of returning to it. Record what was approved, what you are waiting for and where the next person should begin. One person can keep in touch with the client while the rest of the team gets on with other work.

When the answer finally arrives

When the copy finally arrives, someone has to check that it is complete and approved before the team commits to a new build date. Otherwise, the first day back may end with another email asking for something that is still missing.

After a long pause, the brief needs a look too. The client may have changed a product or brought in somebody new to approve the site. A short conversation before work resumes is cheaper than finishing pages they no longer need.

If you intend to charge for extra work, check the terms of the job and agree on the fee with the client before starting. Explain what the extra work involves; the project having been open for months is a poor explanation on its own.

Start with one stalled project

Pick one job that should already be finished and review what it has cost so far. Include the hours spent chasing replies and getting people back into the work, even if those hours won’t be billed. If they were recorded as general admin, they belong with the job when you review its cost.

Fini uses each person’s cost rate to calculate labour costs from their logged project hours, including non-billable work. Log the chasing and restarts against the job, and those hours become part of its recorded cost.

Then ask whoever will finish it for an estimate of the work remaining, including the time needed to get back into it. Add the cost of that work to what the job has already cost, and compare the total with the fee. What is left has to cover overhead and profit. You can then discuss the outstanding decisions and a new delivery date with the client, knowing what finishing the job is likely to cost.

When it closes, keep the hours spent chasing replies and restarting in the final cost. You’ll need them when pricing similar work. Before promising six weeks again, find out how the next client’s approvals will fit around production. If that produces a nine-week schedule, put nine weeks in the quote and allow for the work of managing the job over that period.